NASA's Mars Design Reference Mission Goes Nuclear (2001)

Artificial gravity, nuclear-thermal propulsion, 500 days on Mars, inflatable habitats, using martian resources to manufacture rocket propellants - it's NASA's 2001 Bimodal Nuclear-Thermal Mars Design Reference Mission 3.0!
20142015 Drilling for water and life on Mars. Image NASA
2014-2015: Drilling for water and life on Mars. Image: NASA.

In October 2001, nuclear engineers at NASA's Glenn Research Center (GRC) in Cleveland, Ohio, led by Stanley K. Borowski, Advanced Concepts Manager in GRC's Space Transportation Project Office, described a variant of NASA's 1998 Mars Design Reference Mission (DRM) 3.0 based on Bimodal Nuclear Thermal Rocket (BNTR) propulsion. The BNTR DRM concept, first described publicly in July 1998, evolved from nuclear-thermal rocket mission designs Borowski and his colleagues had developed during President George H. W. Bush's abortive Space Exploration Initiative (SEI), which got its start in July 1989.

NASA's first Mars DRM, designated DRM 1.0 in 1997, was developed in 1992-1993. It was based on Martin Marietta's 1990 Mars Direct mission plan. SEI's demise temporarily halted NASA DRM work in 1993. The civilian space agency resumed its DRM studies after the announcement in August 1996 of the discovery of possible microfossils in martian meteorite ALH 84001. This enabled NASA planners to release their baseline chemical-propulsion DRM 3.0 in 1998. There was no official DRM 2.0, though a "scrubbed" (that is, mass-reduced) version of DRM 1.0 bears that designation in at least one NASA document.

Shortly thereafter, NASA's Johnson Space Center (JSC) in Houston, Texas, which led the DRM study effort, was diverted from DRM work by the in-house COMBO lander study. In the absence of guidance from Houston, NASA GRC developed a pair of DRM 3.0 variants: a solar-electric propulsion (SEP) DRM 3.0 and the BNTR DRM 3.0 considered here.

Photo by Alex Washburn/WIREDProposed Magnum rocket. Image: NASA

In BNTR DRM 3.0, two unpiloted spacecraft would leave Earth for Mars during the 2011 low-energy Mars-Earth transfer opportunity, and a third, bearing the crew, would depart for Mars in 2014. Components for the three spacecraft would reach Earth orbit on six Shuttle-Derived Heavy-Lift Launch Vehicles (SDHLVs), each capable of launching 80 tons into 220-mile-high assembly orbit, and in the payload bay of a winged, reusable Space Shuttle Orbiter, which would also deliver the Mars crew.

The SDHLV, often designated Magnum, was a NASA Marshall Space Flight Center design. Magnum would burn liquid hydrogen (LH2)/liquid oxygen (LOX) chemical propellants in its core stages and solid propellant in its side-mounted boosters. Magnum drew upon existing Space Shuttle hardware: its core stages were derived from the Space Shuttle External Tank and its twin solid-propellant rocket boosters were based on the Shuttle's twin Solid-Rocket Boosters.

SDHLV 1 would launch Bimodal Nuclear Thermal Rocket (BNTR) stage 1 with 47 tons of LH2 propellant on board. Each BNTR DRM mission would need three 28-meter-long, 7.4-meter-diameter BNTR stages. The BNTR stages would each include three 15,000-pound-thrust BNTR engines developed as part of a joint U.S./Russian project in 1992-1993.

SDHLV 2 would boost an unpiloted 62.2-ton cargo lander into assembly orbit. The cargo lander would include a bullet-shaped Mars aerobrake and entry heat shield (which would double as the cargo lander's Earth launch shroud), landing parachutes, a descent stage, a 25.8-ton Mars surface payload including an in-situ resource utilization (ISRU) propellants factory, four tons of "seed" LH2 to begin the process of manufacturing propellants on Mars, and a partly fueled Mars Ascent Vehicle (MAV) made up of a conical Earth Crew Return Vehicle (ECRV) capsule and an ascent stage. The cargo and habitat lander engines would burn liquid methane fuel and LOX.

SDHLV launch 3, identical to SDHLV launch 1, would place into assembly orbit BNTR stage 2 containing 46 tons of LH2 propellant. SDHLV launch 4 would place the unpiloted 60.5-ton habitat lander into assembly orbit. The habitat lander would include a Mars aerobrake & entry shield/launch shroud identical to that of the cargo lander, parachutes, a descent stage, and a 32.7-ton payload including the crew's Mars surface living quarters.

Like most point-and-shoots, it takes pretty good panoramas. Click through to see the untouched image at full size. Photo: Lauren Crabbe/Wired2011: The cargo and habitat landers with their attached bullet-shaped aerobrake/entry heat shields and BNTR rocket stages await the command to depart Earth orbit for Mars. Image: NASA

The BNTR stage forward section would include chemical thrusters. These would provide maneuvering capability so that the stages could dock with the habitat and cargo landers in assembly orbit. During flight to Mars, the thrusters would provide each stage/lander combination with attitude control.

The BNTR 1/cargo lander combination would have a mass of 133.7 tons, while the BNTR 2/habitat lander combination would have a mass of 131 tons. Both combinations would measure 57.5 meters long. As the 2011 launch window for Mars opened, the BNTR stages would activate their engines to depart assembly orbit for Mars.

Each BNTR engine would include a nuclear reactor. When moderator elements were removed from its nuclear fuel elements, the reactor would heat up. To cool the reactor so that it would not melt, turbopumps would drive LH2 propellant through it. The reactor would transfer heat to the propellant, which would become an expanding very hot gas and vent through an LH2-cooled nozzle. This would propel the spacecraft through space.

Following completion of Earth-orbit departure, the BNTR engine reactors would switch to electricity-generation mode. In this mode, they would operate at a lower temperature than in propulsion mode, but would still be capable of heating a working fluid that would drive three turbine generators. Together the generators would make 50 kilowatts of electricity. Fifteen kilowatts would power a refrigeration system in the BNTR stage that would prevent the LH2 it contained from boiling and escaping.

Much like the LH2 propellant in BNTR propulsion mode, the working fluid would cool the reactor; unlike the LH2, however, it would not be vented into space. After leaving the turbine generators, it would pass through a labyrinth of tubes in radiators mounted on the BNTR stage to discard leftover heat, then would cycle through the reactors again. The cycle would repeat continuously throughout the journey to Mars.

2012: cargo lander arrives on Mars. Image: NASA

As Mars loomed large ahead, the turbine generators would charge the lander batteries. The BNTR stages would then separate and fire their engines to miss Mars and enter a safe disposal orbit around the Sun. The landers, meanwhile, would aerobrake in Mars's upper atmosphere. The habitat lander would capture into Mars orbit and extend twin solar arrays to generate electricity. The cargo lander would capture into orbit, then fire six engines to deorbit and enter the atmosphere a second time. After casting off its heat shield, it would deploy three parachutes. The engines would fire again, then landing legs would deploy just before touchdown. The GRC engineers opted for a horizontal landing configuration; this would, they explained, prevent tipping and provide the astronauts with easy access to the lander's cargo.

As illustrated in the cargo lander image above and the MAV launch image below, the four MAV engines would serve double-duty as cargo lander engines. In addition to saving mass by eliminating redundant engines, this would test-fire the engines before the crew would use them as MAV ascent engines.

The cargo lander, including its MAV component, would touch down on Mars with virtually empty tanks. After touchdown, a teleoperated cart bearing a nuclear power source would lower to the ground and trundle away trailing a power cable. Controllers on Earth would attempt to place in far enough away that the radiation it emitted would not harm the crew when they arrived. The reactor's first job would be to power the lander's ISRU propellant plant, which over several months would react the seed hydrogen brought from Earth with martian atmospheric carbon dioxide in the presence of a catalyst to produce 39.5 tons of liquid methane fuel and LOX oxidizer for the MAV ascent engines.

SDHLV launch 5, identical to SDHLV launches 1 and 3, would mark the start of launches for the 2014 Earth-Mars transfer opportunity. It would place BNTR stage 3 into assembly orbit with about 48 tons of LH2 on board. Because it would propel a piloted spacecraft, its BNTR engines would require a new design feature: each would include a 3.24-ton shield to protect the crew from the radiation it produced while in operation. Each shield would create a conical radiation "shadow" in which the crew would remain while they were inside or close to their spacecraft.

2013: Crew Transfer Vehicle assembly begins in Earth orbit. Image: NASA

Thirty days after SDHLV launch 5, SDHLV launch 6 would place into assembly orbit a 5.1-ton spare Earth Crew Return Vehicle (ECRV) attached to the front of an 11.6-ton truss. A 17-meter-long tank with 43 tons of LH2 and a two-meter-long drum-shaped logistics module containing 6.9 tons of contingency supplies would nest along the truss's length. BNTR stage 3 and the truss assembly would rendezvous and dock, then propellant lines would automatically link the truss tank to BNTR stage 3.

A Shuttle orbiter carrying the Mars crew and a 20.5-ton deflated Transhab module would rendezvous with the BNTR stage 3/truss combination one week before the crew's planned departure for Mars. Following rendezvous, the spare ECRV would undock from the truss and fly automatically to a docking port in the Space Shuttle payload bay. Astronauts would then use the Shuttle's robot arm to hoist the Transhab from the payload bay and dock it to the front of the truss in the spare ECRV's place.

The Mars astronauts would enter the spare ECRV and pilot it to a docking at a port on the Transhab's front, then enter the cylindrical Transhab's solid core and inflate its fabric-walled outer volume. The inflated Transhab would measure 9.4 meters in diameter. Unstowing floor panels and furnishings from the core and installing them in the inflated volume would complete assembly. Transhab, truss, and BNTR stage 3 would make up the 64.2-meter-long, 166.4-ton Crew Transfer Vehicle (CTV).

2014: Space Shuttle Orbiter arrives at the Crew Transfer Vehicle with the first Mars landing mission crew and their inflatable Transhab living quarters. Image: NASA
2014: Crew Transfer Vehicle departs Earth orbit. Image: NASA.

The truss-mounted tank and BNTR stage 3 would hold 90.8 tons of LH2 at the start of CTV Earth-orbit departure on 21 January 2014 (as I write this, just three days from now in some parallel universe). The truss tank would provide 70% of the propellant needed for departure. In the most demanding departure scenario, the BNTR engines would fire twice for 22.7 minutes each time to push the CTV out of Earth orbit toward Mars.

Following Earth-orbit departure, the crew would jettison the empty truss tank and use small chemical-propellant thrusters to start the CTV rotating end over end at a rate of 3.7 rotations per minute. This would create acceleration equal to one Mars gravity (38% of Earth gravity) in the Transhab module. Artificial gravity was a late addition to BNTR DRM 3.0; it made its first appearance in a June 1999 paper, not in the original July 1998 BNTR DRM 3.0 paper.

Photo by Alex Washburn/WiredNASA image of inflatable Transhab module. This is NASA's proposed weightless Transhab design; in BNTR DRM 3.0, featured artificial gravity, "down" would be toward the top of the image.

In artificial-gravity mode, "down" would be toward the spare ECRV on the CTV's nose; this would make the Transhab's forward half its lower deck. Halfway to Mars, about 105 days out from Earth, the astronauts would stop rotation and perform a course-correction burn using the attitude-control thrusters. They would then resume rotation for the remainder of the trans-Mars trip.

The CTV would arrive in Mars orbit on 19 August 2014. The crew would halt rotation, then three BNTR engines would fire for 12.3 minutes to slow the spacecraft for Mars orbit capture. The spacecraft would complete one Mars orbit each 24.6-hour martian day.

The crew would pilot the CTV to rendezvous with the habitat lander in Mars orbit, taking care to place it in the CTV's radiation shadow. If the cargo lander on the surface or the habitat lander in Mars orbit had malfunctioned while awaiting the astronauts' arrival, then the crew would remain in the CTV in Mars orbit until Mars and Earth aligned for the flight home (a wait time of 502 days). They would survive by drawing upon the contingency supplies in the drum-shaped logistics module attached to the truss. If the habitat and cargo landers checked out as healthy, however, then the crew would fly the spare ECRV to a docking port on its side. After discarding the spare ECRV and the habitat solar arrays, they would fire the habitat lander's engines, enter Mars's atmosphere, and land near the cargo lander.

The habitat lander's horizontal configuration would provide the astronauts on board with easy access to the martian surface. After the historic first footsteps on Mars, the astronauts would inflate a Transhab-type habitat attached to the side of the habitat lander and commence a program of Mars surface exploration lasting nearly 17 months.

The Crew Transfer Vehicle fires its nuclear-thermal rocket engines to slow down so Mars's gravity can capture it into orbit. Image: NASA
2014-2015: Habitat (foreground) and cargo landers on Mars. A Transhab-type component on the side of habitat lander provides extra living & working space. Image: NASA.

Near the end of the surface mission, the unmanned CTV would briefly operate its nuclear engines to trim its orbit for its crew's return. The MAV bearing the crew and about 90 kilograms of Mars samples would then lift off burning methane and oxygen propellants manufactured from carbon dioxide in the martian atmosphere. Taking care to remain in the CTV's radiation shadow, it would dock at the front of the Transhab, then the astronauts would transfer to the CTV. They would cast off the spent MAV ascent stage, but would retain the MAV ECRV for Earth reentry.

The CTV would leave Mars orbit on 3 January 2016. Prior to Mars orbit departure, the astronauts would abandon the contingency supply module on the truss to reduce their spacecraft's mass so that the propellant remaining in BNTR stage 3 would be sufficient to launch them home to Earth. They would then operate the NTR engines for 2.9 minutes to change the CTV's orbital plane, then again for 5.2 minutes to place themselves on course for Earth. Soon after, the crew would the CTV end over end to create acceleration equal to one Mars gravity in the Transhab. About halfway home they would stop rotation, perform a course correction, then resume rotation. Flight to Earth would last 190 days.

Near Earth, the crew would stop CTV rotation for the final time, enter the MAV ECRV with their Mars samples, and undock from the CTV, again taking care to remain in the radiation shadow. The abandoned CTV would fly past Earth and enter solar orbit. The MAV ECRV, meanwhile, would reenter Earth's atmosphere on 11 July 2016.

2015: The Mars Ascent Vehicle bearing the crew lifts off from the cargo lander burning propellants manufactured from Mars resources. Image: NASA.
2016: Homeward bound - the Crew Transfer Vehicle, its propellant and supplies almost exhausted, approaches Earth at the end of a 900-day voyage of discovery. Image: NASA.

The authors compared their Mars plan with the baseline chemical-propulsion DRM 3.0 and with the NASA GRC SEP DRM 3.0. They found that their plan would need eight vehicle elements, of which four would have designs unique to the BNTR DRM 3.0. The baseline DRM 3.0, by contrast, would need 14 vehicle elements, 10 of which would be unique, and the SEP DRM would need 13.5 vehicle elements, 9.5 of which would be unique. BNTR DRM 3.0 would require that 431 tons of hardware and propellants be placed into Earth orbit; the baseline DRM 3.0 would need 657 tons and SEP DRM 3.0, 478 tons. Borowski and his colleagues argued that fewer vehicle designs and reduced mass would add up to reduced cost and mission complexity.

The BNTR DRM 3.0 variant became the basis for DRM 4.0, which was developed during NASA-wide studies in 2001-2002 (though NASA documents occasionally back-date DRM 4.0 to 1998, when BNTR DRM 3.0 was first proposed). DRM 4.0 differed from BNTR DRM 3.0 mainly in that it adopted a "Dual Lander" design concept developed as part of JSC's 1998-1999 COMBO lander study. This will be described in a future Beyond Apollo post. In 2008, a decade after BNTR DRM 3.0 first became public, NASA released a version of DRM 4.0 modified to use planned Constellation Program hardware (for example, the Ares V heavy-lift rocket in place of the Magnum and the Orion MPCV in place of the ECRVs). It dubbed the new DRM Design Reference Architecture (DRA) 5.0.

References

"Bimodal Nuclear Thermal Rocket (NTR) Propulsion for Power-Rich, Artificial Gravity Human Exploration Missions to Mars," IAA-01-IAA.13.3.05, Stanley K. Borowski, Leonard A. Dudzinski, and Melissa L. McGuire; paper presented at the 52nd International Astronautical Congress in Toulouse, France, 1-5 October 2001.

"Artificial Gravity Vehicle Design Option for NASA's Human Mars Mission Using 'Bimodal' NTR Propulsion," AIAA-99-2545,Stanley K. Borowski, Leonard A. Dudzinski, and Melissa L. McGuire; paper presented at the 35th AIAA/ASME/SAE/ASEE Joint Propulsion Conference & Exhibit in Los Angeles, California, 20-24 June 1999.

"Vehicle and Mission Design Options for the Human Exploration of Mars/Phobos Using 'Bimodal' NTR and LANTR Propulsion," AIAA-98-3883, Stanley K. Borowski, Leonard A. Dudzinski, and Melissa L. McGuire; paper presented at the 34th AIAA/ASME/SAE/ASEE Joint Propulsion Conference & Exhibit in Cleveland, Ohio, 13-15 July 1998.

Related Beyond Apollo Posts

NASA's First Nuclear-Thermal Mars Expedition Study (1960)

The Last Days of the Nuclear Shuttle (1971)

Ernst's Ions Week Concludes: NERVA-Ion Mars Mission (1966)